• Start from U5
  • Turn up 90 degrees (valley fold) the two upper tiles (second floor) of the two East stacks
  • Turn down 90 degrees the two lower tiles (first floor) of the two South stacks
  • Turn up 90 degrees a flap tile into the final shape